联合开发网   搜索   要求与建议
                登陆    注册
排序按匹配   按投票   按下载次数   按上传日期
按分类查找All 处理器开发(1) 
按平台查找All PPT(1) 

[处理器开发] Production-material-control

企业生产物料控制。MPS是确定每一具体的最终产品在每一具体时间段内生产数量的计划。这里的最终产品是指对于企业来说最终完成、要出厂的完成品,它要具体到产品的品种、型号。这里的具体时间段,通常是以周为单位,在有些情况下,也可以是日、旬、月。主生产计划详细规定生产什么、什么时段应该产出,它是独立需求计划。主生产计划根据客户合同和市场预测,把经营计划或生产大纲中的产品系列具体化,使之成为展开物料需求计划的主要依据,起到了从综合计划向具体计划过渡的承上启下作用。
Production material control。MPS is to determine the final product of each specific plan production quantities in each specific period of time. The final product is for enterprises eventually completed, the finished goods to the factory, it should be specific to the product varieties, models. Here specific time period, usually in units of weeks, in some cases, and may be a date, ten days, months. Master production schedule specifies what is produced, what period of time should be the output, it is independent of demand planning. Master production schedule according to customer contracts and market forecasts, the product line in the business plan or the production outline concrete, so that the main basis to expand the material requirements planning, play the role of a comprehensive plan for the transition to the specific plans nexus. (2012-12-20, PPT, 744KB, 下载5次)

http://www.pudn.com/Download/item/id/2090741.html
总计:1